Skip to Main Content
Integration


This is an IBM Automation portal for Integration products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.


ADD A NEW IDEA

All ideas

Showing 1327

Enhancement to support latest versions of JSON schema for validation (draft 2020-12 and draft 2019-09)

As per the product documentation, DataPower gateway only supports draft 03 and draft 04 version of JSON schema which are outdated version of JSON schema.New integrations require validations using latest version of JSON schema (draft 2020-12 and dr...
4 months ago in DataPower Gateway 2 Future consideration

Increase the number of connections between CICS and IIB that are self-installed

Increase the number of connections between CICS and IIB that are self-installed, as the maximum alocated is 100 even when is configured more than 100 conections in ReceiveCount parâmeter of IPCON CICS resource. Through the so-called TS014867793, w...
7 months ago in App Connect 2 Future consideration

Support filtering (skipping) of event messages by header values

We have various products that we want to store events for in ES. These products are organized in categories and e.g. by order numbers. We add these information as event headers so consumer can filter by them before unmarshalling the JSON. With the...
4 months ago in IBM Event Automation / Event Endpoint Management 0 Future consideration

Support deletion of JSON child objects as part of Option redaction

As we have complex events with partly sensitive information in deeper child objects, we'd like to just store a single event per "change" in the Event Streams and define multiple options for the topic defining a redaction control to remove several ...
4 months ago in IBM Event Automation / Event Endpoint Management 1 Future consideration

if user sign-on to the queue manager fails we see the RACF-Message, but there exists no correponding massage which can identify the Channel or IP-Adress of the causer

in our case a srvconn tried to logon with an userid ‚admin‘ which does not exists in RACF. This happens automaticaly several times at a minute and made our joblog unreadable with mass of ICH408I messages. We did not find the causer of this problem...
11 months ago in MQ, MQ Advanced & MQ Appliance 3 Future consideration

Deploy time(UTC) column change to Local Time

Please change the deploy time to local time zone in the App connect version 12 web console. it would-be useful to admins to get the exact time without using manual time conversions.
about 2 years ago in App Connect 4 Future consideration

Create general overview documentation about CP4I product updates and compability

In a meeting with IBM I have raised the topic that there is a missing general overview documentation about CP4I product updates and compability similarly as there is an existing for ACE fixpacks, operators & operands like https://www.ibm.com/...
about 2 months ago in Cloud Pak for Integration (CP4I) 2 Future consideration

App Connect Enterprise- Enhance mqsideploy command to deploy application & policy project with latest artifacts and restart applications in that IntegrationServer

Deployment of an ACE application which are referring to Policy Projects(even though there is no change in Policy Projects) are erroring out and required either to run mqsideploy 1. with “--restart-all-applications” if it involves wsecbindings Poli...
over 1 year ago in App Connect 2 Future consideration

APP Connect Enterprise-Stop emitting or disabling monitoring events based on user inputs like payload size or log level at broker/eg level using mqsi change commands

All the ACE(App Connect Enterprise) applications use a built-in feature (called event monitoring) of IBM ACE, for emitting monitoring events to capture the payloads as part of their business transactions. All these monitoring events are emitted fr...
over 1 year ago in App Connect 3 Future consideration

AMQP supported in the MQ Operator

The use of AMQP is a requirement for the customer due to the integration of node applications. As per the docs, AMQP is not currently supported on MQ Operator when using IBM MQ Operator, but, It is supported if you build your own image. Using the ...
9 months ago in MQ, MQ Advanced & MQ Appliance 0 Future consideration