Skip to Main Content
Integration


This is an IBM Automation portal for Integration products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.


ADD A NEW IDEA

Pinned ideas

View all
PINNED Add a "Maximum persistent reuse" parameter for the backside of an MPGW or WSP
On an MPGW or a WSP, I want to be able to configure that the persistent backside connection should be closed after X amount of requests have been sent through that connection. I can already do this for the frontside by setting the "Maximum persist...
PINNED supports ECDH-ES algorithms for JWE
Debit or credit card tokenizers (THALES / VISA / Etc.) implement JWE with ECDH as an encryption mechanism for sensitive data in the different flows applicable to wallets such as Apple Pay, GPay, etc. given its wide diffusion and easy adoption.

All ideas

Showing 1387

Mapping node unit tester

There are two type of maps available in the toolkit: XML Data map and the Message Map. The XML Data Map provides a map tester that allows to test the map directly into the toolkit without the need to deploy the flow. This is not available for the ...
over 10 years ago in App Connect 3 Future consideration

Mainframe USS SINK Connector to deliver messages once only

The SINK connector duplicates messages being sent from Kafka to MQ on the mainframe via the USS SINK Connector when there is an error received from the MQ queues. Refer to initial log TS012714044 for detailed description of what is observed. The b...
over 1 year ago in IBM Event Automation / Event Streams 0 Future consideration

Increase the 50MB filesize limit for the Amazon S3 connector.

Can you please increase the 50MB filesize limit against the Amazon S3 connector or enable multiparting.
over 1 year ago in App Connect 1 Future consideration

Add support for websocket upgrade with OpenApi 3 specifications

Presently websocket upgrades are only supported with OpenApi 2. For existing OpenApi 3 Apis we are required to create a separate OpenApi 2 specification in order to proxy websocket connections via the API Gateway.
over 1 year ago in API Connect 0 Future consideration

AoC: Shared Folders Search and Sorting

Customer has over 300 Shared Folders. There isn't a way to search or sort Shared folders in: Admin > Workspaces > TheWorkspace > Applications > Files > Shared Folders Please add search and sort options.
over 2 years ago in Aspera Ideas 0 Future consideration

Discover Un-Managed Asset Using ILMT.

Very often especially in a midsize + organization where server assets are all over the places and managed by different teams. It is very hard for the SAM team or even the infrastructure team to know where all the server assets are located and mana...
about 4 years ago in IBM License Metric Tool (ILMT) 0 Future consideration

Performance issues visibility per project

Our main concern - there is no way to find out which project, orchestration or maybe internal castiron's process causes the issue. There's no per-project view of resources utilization. And seems like IBM support also can't detect from the postmort...
about 3 years ago in App Connect 1 Future consideration

HTTPInput and HTTPRequest nodes should have the option to set the Message Parsing to use the HTTP Header ContentType

HTTPInput and HTTPRequest nodes should have the option to set Message Parsing to use the HTTP Header ContentType So if it gets Content-Type=application/xml it uses the XMLNSC parser and if it gets Content_Type=application/json it uses the JSON par...
over 1 year ago in App Connect 1 Future consideration

Front Side Timeout Settings in IBM API Connect API Gateway

The API Gateway service in IBM API Connect version 2018.4.1 doesn't have any settings for front side timeout like all other services as MPGW, WSP etc. This RFE is just to get this feature available in the product.
almost 5 years ago in DataPower Gateway 0 Future consideration

Urgently need support for .net managed mode advanced message security

Here are the links that explain AMS support in .NET http://pic.dhe.ibm.com/infocenter/mqams/v7r0m1/index.jsp?topic=%2Fcom.ibm.mqese.doc%2Ftroubleshooting%2Ftroubleshooting_netsupport.htm http://www-01.ibm.com/support/knowledgecenter/SSFKSJ_7.5.0/c...
over 10 years ago in MQ, MQ Advanced & MQ Appliance 3 Future consideration